Code For Use Of Concrete Pump

Dec 25, 2021

(1) The towed concrete pump can be towed by motor vehicles, but shall not carry any goods, and the towing speed shall not exceed 8km / h;

(2) The pressure of each safety valve of the hydraulic system of the concrete pump shall meet the requirements of the manual, and the user shall not adjust or change;

(3) Anti freezing measures shall be taken for concrete delivery pump during construction in cold season;

(4) During construction in hot season, the oil temperature of concrete pump shall be prevented from being too high. When the temperature reaches 70 ℃, stop the operation or take other measures to cool down;

(5) After pumping concrete, clean the hopper, s valve, concrete cylinder and conveying pipeline in time. After the pump is cleaned, release the pressure of the accumulator, cut off the power supply, and keep all switches in the stop or off position;

(6) Workers shall not climb or ride on the transmission pipeline, and they shall absolutely avoid working at heights;

(7) After pumping concrete and before cleaning, reverse the pump for several strokes to reduce the pressure in the delivery pipe and avoid accidents;

(8) Safety and accident prevention devices shall be set on the construction site. For example, indication and warning signs, fences, metal baffles, etc., necessary working areas (not less than 1m) shall be set around the pump. Non operators shall not enter without permission. Regularly replace the conveying pipeline within three meters from the operator, which must be fastened and protected with wooden board or metal partition;

(9) It is forbidden to operate when the reading of vacuum gauge is greater than 0.04MPa, otherwise the main oil pump may be damaged;

(10) The use, installation and wiring of the electrical control box must be carried out by professionals;

(11) The concrete in the hopper of the concrete delivery pump must be higher than the mixing shaft to avoid concrete splashing due to air inhalation;

(12) At the end of pumping operation, when transferring the revenue and expenditure legs of the pump, first retract the rear outrigger, put down the ground wheel, and then retract the front outrigger;

(13) The operator (the pump operator of the concrete transfer pump) shall record the operation of the concrete pump as required.

(14) The concrete pump shall be firmly fixed before use, and four supporting feet shall be supported to make the tire off the ground, or the tire shall be removed. Check the support of the hopper and chute on the upper part of the pump to ensure stability and reliability. Pay special attention to casualties caused by pump overturning!

(15) When pumping, pay attention to eye injury caused by concrete splashing or other objects entering the eyes!

(16) The power wiring of concrete pump must be equipped with leakage protection switch. Always check whether the electrical components work normally and whether the cable is damaged to prevent casualties caused by electric shock!

(17) Ensure the reliable connection of the transmission pipeline and conduct regular maintenance to prevent personnel injury caused by pipe clamp, pipeline burst or blockage!

(18) It is forbidden to open the hydraulic pipe joint or loosen the hydraulic flange bolt when the hydraulic system is not unloaded. High pressure hydraulic oil injection can cause great harm!

(19) When the pump is working, it is strictly forbidden to reach into the area with moving parts such as hopper, water tank and reversing oil cylinder. When it needs to be checked, it should be shut down for operation!